Description of the Works
Installation of a new underground main cable running from the corner of Schofield/Brockington Extension at the bottom of the grassed bank (not a location usually used by students or staff) running up the grassed bank to the pathway adjacent to Wavy Top. At the top of the bank the trench will run towards (but not up to) Wavy Top main entrance. The trenched area will be closed off by Heras Fencing while the trench is open.
Access will still be available into Wavy Top main entrance from James France side of the building and the steps from Brockington Extension. Access into Wavy Top from Car Park will be possible through the ramped access door at the car park end of the building.
I thank you all in advance for your cooperation during these works. We have considered all options and best dates to cause the least impact on university operations. If you have any concerns, please contact Ian Litchfield
Timescale
Works to be carried out from Thursday 19 June 2025 through to Friday 11 July 2025.
How can I get more information and help?
The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.
Name and Job Title Ian Litchfield, Electrical Engineer
Mobile: 07966874343
Email: i.litchfield@lboro.ac.uk