Description of the works

WHY DOES THE WORK NEEED TO BE DONE

The work needs to be done to ensure fire safety compliance within university buildings.

HOW WILL THE WORKS AFFECT ME?

The Firemark service engineers will be working in various locations around the building, with most of the work in corridors and staircases. The disruption is expected to be minimal. The contractor has been asked to report to reception where applicable, prior to carrying out the inspections in each building.

(081) Sport Park

(078) Michael Pearson East

(079) Michael Person West

(058) Holywell Building

(060) NCCAT Offices

(225) NCCAT Labs

(021) S Building

(219) Stem Lab

(066) Stewart Miller

(057) Sir Denis Rooke

(077) Keith Green

(023) Sir Frank Gibb Teaching

(024) Sir Frank Gibb Labs

(030) Pilkington Library

(050) Wolfson Annex

(065) Wolfson Mech/ManEng

Timescale

From 22/06/25 to 31/10/25 Fire doors inspections will take place in the buildings above between, 9.00am -5.00pm.

How can I get more information and help?

The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.

Rod Harrison - Fire Compliance Contract Supervisor           

Mobile: 07729080155

Email:  r.m.harrison@lboro.ac.uk