Multiple Buildings - Fire Extinguisher Maintenance - 2 September - 30 November 2025

Posted: 1 September 2025

Description of the works

WHY DOES THE WORK NEEED TO BE DONE

The work needs to be done to ensure fire safety compliance within University buildings.

HOW WILL THE WORKS AFFECT ME?

The Firemark service engineers will be working in various locations around the building, with most of the work in corridors and staircases. The disruption is expected to be minimal. The contractor has been asked to report to reception where applicable, prior to carrying out the inspections in each building.

Schofield (005)

James France (006)

Brockington (007)

Morag Bell (009)

Edward Herbert (010)

Haslegrave (013)

Sir John Ferguson (022)

Brockington Ext. (029)

Pilkington Library (030)

EIS/LU Performance Centre (031)

3D Design (038)

Edward Barnsley (040)

Fine Art (041)

Matthew Arnold (054)

Security Gatehouse (062)

Sir David Wallace (068)

Sir Richard Morris (069)

Sir John Beckwith (071)

Netball/Badminton (073)

Stewart Mason (076)

Clyde Williams (080)

Loughborough Design School (200)

Hazlerigg (201)

Rutland (203)

Bridgeman (206)

STEM (219)

Timescale

From 2 September 2025 - 30 November 2025 - Fire extinguisher inspection/maintenance will take place in the buildings above between 9.00 a.m. and 5.00 p.m.

How can I get more information and help?

The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.

Rod Harrison - Fire Compliance Contract Supervisor           

Mobile: 07729080155

Email:  r.m.harrison@lboro.ac.uk