Contractors
Information for University contractors
Loughborough University has two campuses and the Loughborough campus is over 500 acres with more than 20,000 users. The manner in which works are undertaken and the standards to be used are therefore a key requirement for contractors working on site.
All contractors working on site are required to be inducted whether directly or indirectly through a principal contractor before commencing any activities. The induction provides essential information on site rules, safety procedures, emergency arrangements, and operational expectations. No work may begin until the induction has been completed and appropriate passes and permits issued.
The contractors Health and Safety Handbook, online Health and Safety Induction and further Helpful information videos can be found via the following link.
Standard requirements and guidance documentation
The following standard requirements and guidance documentation are referred to in our Request for Quotes (RFQ) and Tender Requests and are to be assessed, accepted and allowed for when submitting quotes or tenders. If you have any questions regarding the relevance of these or their content, please contact the Project Manager issuing the RFQ or follow the Tender Request query process.
RFQ’s and Tender Requests should indicate which of these documents are relevant to the procurement process.
Health & safety documents
To ensure contractors operate safely on site.
- Asbestos Management Policy
- Contractor Health and Safety Handbook
- Small Works Policy - (Currently being revised please request)
- Work at Height Policy - (Currently being revised please request)
Design specification documents
To ensure buildings are built to the correct specifications to meet our standards and maintenance requirements.
- Acoustic Performance
- BEMS Specification
- BIM Employers Information Requirements
- BIM Guidance and Questionnaire
- Colostomy UK Stoma Friendly Accessible toilets
- Design Guide
- Fire Design Strategy
- Loughborough University Guidelines for Cycle Storage
- LU Building Services Specification
- LU Ironmongery Specification
- LU Standard Building Specification
- Networking standards Part1 Structured Data Fibre Optic Cabling
- Networking standards Part2 Communication Rooms
- Networking standards Part3 Wireless
- Sustainable Design Guide
Procedures
To ensure contractors operate to our procedures for correct working on site and information provision.
- Contractor Parking
- FM Engineering Statutory Maintenance and Inspection Handover
- LU Asset Register Template
- LU Standard Building O and M Manual
- LU WSP Book Projects and Capital Management
- LU CAD Templates and Standards (multiple documents)
- Procedure for fire alarm in fault in Academic Buildings
- Procedure for fire alarm in fault in residences
- Procedure for safe working on Fire Alarm Systems
- Procuring the services of Hydrop
- Project Procedure Manual
- RAC Asset Change and Query Form
Environmental protection
To ensure contractors operate to our standards for compliance with environmental legislation and our ISO14001 EMS Procedures.
- Construction Environmental Protection
- Environmental Implications for FM Contractors
- Small Works Waste Process
- Construction Site Waste Management Process
- Waste Transfer Notes and Consignment Notes
- Tree Protection
- Emergency Response Procedure for spills and leaks
- Emergency Response Procedure for Internal Spills
- Emergency- Response Procedure for External Spills