Pilkington Library Loading Bay (030) - Roller Shutter Replacement - 8th-17th July 2026

Posted: 1 July 2026

Description of the Works

Supply and installation of a face-fitted electrically operated steel rolling shutter door with motorised operation, safety features, galvanised finish, and manual override.

Timescale

8th - 17th July 2026

How can I get more information and help?

The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.

Name and Job Title: Tom Dell – Building Fabric Surveyor

Mobile:   07895 331 871

Email:  t.dell@lboro.ac.uk