Description of the Works
Supply and install a new unit, including 100mm laminated side panels, a 60mm bullnosed worktop, top boxing with removable access panel and integrated LED strip lighting. Provide removable 18mm MFC rear panels above and below the worktop, together with two flush-mounted sockets, one flush-mounted extraction hood and two microwaves. Supply and fit new grey vinyl flooring.
Timescale
03 September to 18 September 2026
How can I get more information and help?
The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.
Name and Job Title: Tom Dell – Building Fabric Surveyor
Mobile: 07895 331 871
Email: t.dell@lboro.ac.uk