Wolfson Annex (050) - Gas Meter Installation - 29 & 30 January 2026

Posted: 13 January 2026

Description of the works

The works will involve erecting Heras fencing around the site - grassed area behind Wolfson, between Sir Frank Gibb and Wolfson Annex.  A trench will then be excavated and new pipe laid to form a new connection to the Wolfson Annex building.  A new gas meter will be installed within the boiler room, and the new supply connected to the existing boiler.  Additionally, the redundant LU network supply to the Wolfson Annex will be decommissioned, and all associated above-ground pipework will be removed.

Timescale

29 January 2026 - Lay new pipe and form new entry to building

30 January 2026 - Connect new meter and boiler to new supply

How can I get more information and help?

The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.

Aaron Smart - Mechanical Building Services Engineer
Mobile:  07989420705

Email:  a.j.smart@lboro.ac.uk