Description of the Works
WHY DOES THE WORK NEEED TO BE DONE
The work needs to be done to ensure fire safety compliance within university buildings.
HOW WILL THE WORKS AFFECT ME?
The contractor (Rock Compliance Ltd) will be working in various locations around the building, so please observe any barriers and warning signs. The disruption is expected to be minimal; the contractor has been asked to report to reception where applicable, prior to carrying out the inspections in each building.
ATIC (220)
Bridgeman (206)
Clyde Williams (080)
Dan Maskel & LTA Tennis Centres (063 & 072)
Design School (200)
EHB (010)
Haslegrave (013)
Herbert Manzioni (012)
Hockey Pavilion (075)
Holywell Building (058)
Holywell Fitness (216)
Timescale
From 1st October – 24th December 2026 Fire Damper inspections will take place in the buildings above between 9.00 a.m. and 5.00 p.m. (Monday to Friday only).
How can I get more information and help?
The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.
Name and Job Title: Rod Harrison - Fire Compliance Contract Supervisor
Mobile: 07729080155
Email: r.m.harrison@lboro.ac.uk