Description of the Works
Fire Extinguisher Maintenance
WHY DOES THE WORK NEEED TO BE DONE
The work needs to be done to ensure fire safety compliance within the above University buildings
HOW WILL THE WORKS AFFECT ME?
The Firemark service engineers will be working in various locations around the building, with most of the work in corridors and staircases. The disruption is expected to be minimal. The contractor has been asked to report to reception where applicable, prior to carrying out the inspections in each building.
Martin Hall (004)
Towers Dining (224)
Scholefield (005)
Jamess France (006 & 011)
Brockington (007)
Morag Bell (009)
Edward Herbert (010)
Herbert Manzioni (012)
Haslergrave (013)
Angela Marmont (017)
Sir John Furuson (022)
Brockington Extension (029)
EIS Loughborough Performance Cent (031)
FM Yard and boiler house (051)
Burleigh Court (053)
Mathew Arnold (054)
Dan Maskel & Lawn Tennis (063 & 072)
Timescale
From 13/5/26 to 30/08/26 Fire Extinguisher Inspection/maintenance will take place in the buildings above between, 9.00am -5.00pm.
How can I get more information and help?
The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.
Name and Job Title: - Rod Harrison Fire Compliance Contract Supervisor
Mobile: - 07729080155
Email: - r.m.harrison@lboro.ac.uk