Description of the Works
The contractor (Rock Compliance Ltd) will be working in various locations around the building, so please observe any barriers and warning signs. The disruption is expected to be minimal; the contractor has been asked to report to reception where applicable, prior to carrying out the inspections in each building.
WHY DOES THE WORK NEEED TO BE DONE
The work needs to be done to ensure fire safety compliance within university buildings
Brockington Ext (029)
James France (006)
John Pickford (033)
Keith Green (077)
LU Stadium (205)
Loughborough Students Union (380)
Martin Hall (004)
Morag Bell (009)
NCCAT Labs (225)
NCCAT Offices (060)
NCSEM (210)
Netball/Badminton (073)
HOW WILL THE WORKS AFFECT ME?
The RLB Contractors will be working in various locations around the building, inspecting fire doors, with most of the work in corridors and staircases. The disruption is expected to be minimal. The contractor has been asked to report to receptions where applicable prior to carrying out the inspections in each building.
Timescale
From 26th October– 24th December 2026 Fire Damper inspections will take place in the buildings above between 9.00 a.m. and 5.00 p.m. (Monday to Friday only).
How can I get more information and help?
The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.
Name and Job Title: Rod Harrison - Fire Compliance Contract Supervisor
Mobile: 07729080155
Email: r.m.harrison@lboro.ac.uk