Multiple Buildings - Fire Door Inspection - 31/10/25 - (087) 3 Holywell Drive (024) Sir Frank Gibb Labs (017) Angela Marmount/Graduate House (021) S Building (045) Wavy Top (069) Sir Richard Morris

Posted: 21 July 2025

Description of the works

WHY DOES THE WORK NEEED TO BE DONE

The work needs to be done to ensure fire safety compliance within university buildings

HOW WILL THE WORKS AFFECT ME?

The RLB Contractors will be working in various locations around the building, inspecting fire doors, with most of the work in corridors and staircases. The disruption is expected to be minimal. The contractor has been asked to report to receptions where applicable prior to carrying out the inspections in each building.

Timescale

From 22/06/25 to 31/10/25 Fire doors inspections will take place in the buildings above between, 9.00am -5.00pm.

How can I get more information and help?

The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.

Rod Harrison - Fire Compliance Contract Supervisor           

Mobile: 07729080155

Email:  r.m.harrison@lboro.ac.uk