Fire Door Inspection - David Collett Blocks A – F (533 – 538) - Royce Blocks 1 – 5 (469 479, 480, 481,484) - Royce Blocks 9 – 12 (490,491,492,468) - Royce Blocks 14 - 24 (485, 478, 477, 476, 482, 483, 472-475) - 18/03/25 to 30/04/25

Posted: 17 March 2025

Description of the Works

This work needs to be done to ensure fire safety compliance within university buildings.

The Contractors (RLB) will be working in various locations around the building, inspecting fire doors, with most of the work in corridors and staircases. The disruption is expected to be minimal. The contractor has been asked to report to receptions where applicable prior to conducting the inspections in each building.

Timescale

18/03/25 to 30/04/25 Fire doors inspections will take place in the buildings above between, 9.00am -5.00pm.

How can I get more information and help?

The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.

Rod Harrison - Fire Compliance Contract Supervisor

Mobile:  07729080155

Email:  r.m.harrison@lboro.ac.uk