Contractors - Registration process
Contractor management
It is a requirement for contractors who intend to work on the campus to have completed the online site induction and pass a test linked to the induction which then enables them to be issued with a valid contractor pass.
Induction
The induction gives you an overview of site procedures. The link to the health and safety induction is available on the main contractors page and below.
You are required to complete the induction, watch the videos that are imbedded within the induction. It is important to watch the full content as the test is based on this! Once the induction is completed the system will ask you for your details.
- Please ensure all boxes are filled in as if incomplete the pass will not be issued which may cause a delay in the works.
- As part of this process, you will be required to know and enter your LU project Manager/ Person Managing the works.
- This is import as they receive an email to confirm that the induction and test have been completed and passed.
- Use the dropdown list if you do not know your project manager, please contact your supervisor/Manager to resolve the issue.
- Do not select a random name from the list as will invalidate the induction process and the process will need to be restarted from the beginning.
- The information from this page is used as the source information for your contractor pass.
You will then be asked to complete a multiple-choice quiz based on the induction and content you have watched, and you must achieve an 80% pass mark, if this is not achieved no pass can be issued. If you do fail the test, you will be able to take it again immediately.
Example question:
8 - How far do you need to be away from a University building before you can smoke?
(1 point)
- 2m
- 3m
- 6m
- 4m
Collection of a pass
Prior to your first day on site you will receive a welcome message from our contractor system providing you with a QR code which you will use on your first sign in at one of our consoles (locations below). On your first day onsite pick up your pass. The system will take your photo , you will then meet your Project Manager who will provide a site/job specific induction before you can commence works.
All passes have a QR code on them which must be scanned when entering and leaving site. Contractors found not signing in and out will be asked to contact their Project/Contract Manager/Site Contact.
These are located:
- FM Services Yard near the Help desk
- Bridgman Building with the Facilities management area
- Charnwood Reception ( Install date to be Confirmed)