Swimming Pool Floor Tiling Repairs

The Contractor, Telling Finishing, will be carrying out works from Monday 3 to Friday 14 August 2020 around the swimming pool deck. The work will also involve mastic sealant to 2no recessed floor channels and a deep clean of the pool deck area.

Barriers and signage will be in place and will always be supervised by the Contractor.

Works will commence Monday 3 August 8.00 a.m. - 5.00 p.m. Works will be completed by Friday 14 August at 5.00 p.m. The provision of an enclosed waste skip will be provided to the rear of the building as agreed with SDC for the disposal of the damaged floor tiles.

Some disruption in the area will be unavoidable during the refurbishment and access will be restricted to these areas during the work. This will be clearly identified by the contractor carrying out the work. Emergency evacuation routes will remain unaltered during the period of works, with any necessary divisions being advised by further notices and any diversions clearly sign posted. Every effort will be made to keep construction activities to a minimum, specifically noise, dust and work processes.

Posted by
Shaun Green (extension 222265)
Posted on
Tuesday, 28 July 2020 at 9:08 GMT
Posted in
campus

← Students noticeboard