Bring concrete elements to site

Install columns

Grout column bases

Consider activities, hazards and designer actions.
The main activities for a Precast concrete frame are given below.

Click on continue to reveal the hazards and designer actions for each activity

Step 3- Precast Concrete Frame

Install beams

Prepare bases

There are varying flooring system availbale depending upon the structural design and the designers choice-click to view examples

Secondary steel is added in some projects for additional support to the structure or the cladding and other building elements. Normally this is designed after that of the primary structure, and is often considered during or after the primary structure construction period. Therefore it has not been included in the activity steps but has considerable additional health risks such as significant manual handling unless it is designed early enough to be included in the main frame works.

Back to Substructure

D4h Building- Detailed design tool

click to access D4h Hub
Why use D4h
How to use D4h
click to access publications on health and safety
click to access D4h website
Major building case studies
click to access D4h terminology
click to access legislation connected with Health and Safety
click to access the D4h Civil Engineering process page
click to access the D4h Building process page
click to access the D4h Engineeering Construction process page
click to access the D4h Building process page