FACILITIES MANAGEMENT NOTICE OF MAJOR WORKS

FACILITIES MANAGEMENT NOTICE OF MAJOR WORKS

W & S BUILDING ADAPTATION AND REFURBISHMENT PROJECT NO 11452

WORK ON MAINS COLD WATER SUPPLY SERVING THE WEST SITE

There are currently several separate pieces of work planned that will affect the water supplies to the following buildings.

S Building
S Boiler House
Sir David Davies
Wolfson
Wolfson Annexe
Stewart Miller
Sir Frank Gibb Teaching
Sir Frank Gibb Labs
John Pickford
David Collett A, B & C Blocks
David Collett Dining Hall
Robert Bakewell Hall
Hub
Elvyn Richards Accommodation Blocks
Hazlerigg-Rutland Hall
John Phillips Hall
Wardens Houses – Building numbers 556 & 557

WORK ACTIVITY 1 - CHECKING WATER PRESSURES AROUND SYSTEM.

This work is planned for Saturday 12th August 2017 for a 2 hour period early in the morning between 7.00am and 9.00am. This should have minimal impact on any of the buildings, as we are only expecting a slight loss in water pressure, rather than any loss of supply.

WORK ACTIVITY 2 – SEVERN TRENT CHANGING MAIN INCOMING VALVE

This work will have a bigger impact as there will be a loss of supply for a short period during the day - however it is essential this work takes place.

This work is planned for Wednesday 23rd August 2017. Due to how Severn Trent operate, we can only advise that the work will take place sometime between 7.00am and 5.00pm and that the water supply will be turned off for somewhere between 1 and 3 hours. If all goes to plan the work should only take 1-2 hours.

A number of the buildings have tank water supplies and therefore we are hoping that this will mean that there is little or no impact on the supplies in these buildings, particularly toilets. Some buildings however are likely to be without water once the work commences and occupants will therefore have to use alternative toilet facilities in nearby buildings. We will send out an update on alternative toilets facilities and reminder that the work is taking place 2 days in advance of the work.

We will monitor the situation once Severn Trent’s installation team commence work on site and we will update with further notices and information if necessary on the day.

WORK ACTIVITY 3 – CHANGING OVER WATER SUPPLY TO NEW PIPEWORK SYSTEM

There will also need to be several phased planned shutdowns of the system affecting the above mentioned buildings. This is necessary in order to change over from the old pipework to the new, which has been installed as part of the Infrastructure Works. Not all buildings will be affected at the same time. We will schedule these shutdowns either at weekends or evenings to keep disruption to a minimum – dates and more details to be advised in the next few days, but these works will be over the next 3 to 4 weeks.

HOW CAN I GET MORE INFORMATION AND HELP?

• The Facilities Management team looking after the works are as detailed below, and any of them will be pleased to assist in any way possible and practicable with difficulties you experience as a result of these major works.
• Gavin Noon – Project Engineer (Mechanical). Gavin is the main point of contact for any issues or queries you may have about these works. Contact details ext 228067/mobile 07971 324928/email g.b.noon@lboro.ac.uk
• Shaun Green – Project Manager - Contact details ext 222265/mobile 07971 636268/email s.j.green@lboro.ac.uk
• Damien Richmond – Team Leader (Mechanical) - Contact details ex 223796/email D.Richmond@lboro.ac.uk
HEALTH AND SAFETY

• If you have any worries at all about the works, or you have been affected in some way by them, please do contact one of the above staff. We will deal promptly with your concerns.

Posted by
FM Helpdesk (extension 222121)
Posted on
Wednesday, 9 August 2017 at 14:41 GMT